Export puerto rico prefabricated container house as living home

FOB Reference Price:Get Latest Price
US $1,800-2,300 / Sets | 1 Set/Sets (Min. Order)
Material:
steel + sandwich panel
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Putian (PTH)
Model Number:
PTJ8*10A
Use:
Hotel, House, Office, Shop, Toilet, Villa
Certificate:
TUV, SGS, BV,CE,ISO
Wall system:
EPS sandwich panel
Floor:
Plywood & Laminated board
Window:
PVC sliding window
Door:
exterior steel door
Electricity:
custom made
Size:
custom made
Color:
Blue, Gray, Red, White
Material:
All members galvanized
Supply Ability
Supply Ability:
1000 Set/Sets per Month
Packaging & Delivery
Packaging Details
1)Flat packing, 4 units in one package, all knocked down, ship in SOC(shipper owned containers)
2)Flat packing, 7 units loaded into one 40'HQ
Port
Ningbo or Shanghai

Low cost prefabricated building container house for sale

/

 

sizelength6058 mm
width3000 mm                                    
height2600 mm
clear height indoor5800*2200*2300 mm

20'FT Container house connected into 40FT, floor plan

component   long beam                                3mm galvanized                           
short beam2.5mm galvanized
column3mm galvanized
wall panel                75mm Rockwool sandwich board
roof panel100mm Glasswool sandwich board
secondary beamZ-shaped galvanized steel iron
roof insulation75mm polyurethane
Floor panel18mm plywood panel+12mm  laminated floor  or 18mm cement-fiber +2mm PVC
doorSteel Security door,740mmx1950mm
window                    PVC Sliding window with Rolling shutter,1100mmx800mm
electronics, water supply and drainageaccording to the local law
furniture and applianceCustomized-made to your requirements

 

/

 

  

 Click CONTAINER  HOUSE for more information.

.

/

 

1.Contact us
Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
 
 
FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers’ request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.

 

2.What’s your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 15 days after receive deposit. Large order delivery time should be arranged separately.

 

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

4. How to deal with quality problems?

Warranty is 2 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

 

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of container house steel frame is 20 years

 

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.