China Low Cost Prefabricated Double C frame houses for Dorm Camp

FOB Reference Price:Get Latest Price
$100.00 - $150.00 / Square Meters | 100 Square Meter/Square Meters (Min. Order)
Material:
steel and sandwich panel
Shipping:
Support Sea freight
Lead Time:
Quantity(Square Meters) 1 - 1000 >1000
Est. Time(days) 40 Negotiable
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
PTH
Model Number:
assembling container house
Use:
Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa, Warehouse, Workshop,Plant
Size:
L 6058mm* W2438mm* H2591mm
Color:
Blue, Gray, Red, White
Certificates:
TUV, SGS, BV,CE,ISO
Roof:
100mm ALC panel
Wall system:
100mm ALC panel
Column:
ALC panel
Floor:
18mm Plywood & 12mm Laminated board
Window:
2 AL single glass sliding window
Door:
steel security door or sandwich panel door
Performance:
Seismic Resistance,Wind Resistance,Fire Resistance
Supply Ability
Supply Ability:
5000 Square Meter/Square Meters per Month
Packaging & Delivery
Port
Shanghai or Ningbo
Lead Time :
Quantity(Square Meters) 1 - 1000 >1000
Est. Time(days) 40 To be negotiated

 

Prefabricated Light Gauge Steel Structure buildings 

/

/

S/N

Item Name

Specification

1

Main Steel Frame

light gauge steel ,Q345B galvanization 275g/m2

2

Wall System

 EPS/PU/rock wool sandwich panel

 ALC panel (autoclaved lightweight concrete)

3

Roof System

Corrugated Sandwich Panel

4

Door

Steel door/sandwich panel door

5

Window

Aluminum/PVC window

6

Ceiling

Gypsum board/PVC/steel plate

7

Floor

Fiber cement board/wooden floor/PVC/ceramic tile

8

Electricity&Plumbing

Customized as clients' requests and local standard

/

/

 Click STEEL STRUCTURE BUILDING for more information.

/

 /

1.Contact us
Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
 
 
FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers’ request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.

 

2.What’s your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 30 days after receive deposit. Large order delivery time should be arranged separately.

 

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

4. How to deal with quality problems?

Warranty is 2 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

 

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of double C structure is 20 years

 

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.